References
References
IPSA INSTITUT
Wind Resource Assessment and Technical Due Diligence for 25 MW Ivan Sedlo WEPP
Capacity: 25 MW
Country: Bosnia and Herzegovina
Brief Description:
• Wind Resource Measurement Campaign Review
• Wind farm Layout Review
• Energy Yield Calculation Review
• Independent Energy yield calculation
SAB-WIND TEAM
Consultancy services for Review of turbine supply agreement for Rohrsheim Wind Farm
Country: Germany
Brief description/Deliverables:
Review and commenting of Turbine supply agreement for a wind farm
ARTIBİR ENERJİ A.Ş. – ZİRAAT KATILIM BANKASI A.Ş. – VAKIF KATILIM BANKASI A.Ş. -EMLAK KATILIM BANKASI A.Ş
Due Diligence for Lender
Technical and financial due diligence prior to financial closure of Gaziosmanpaşa WEPP
Capacity: 50 MW
Country: Türkiye
Brief description:
• Review of Legislation and Permits
• Review of Supplier Contracts
• Presentation and Meeting at the Lender’s office
SANKO ENERJİ – ICBC TÜRKİYE
Due Diligence for Lender
Capacity: 54 MW
Country: Turkiye
Brief description:
Due Diligence Prior to Financial Closure:
• Review of Electrical Balance of Plant (eBoP)
• Review of Civil Balance of Plant (cBoP)
• Review of Permits
• Review of Supplier Contracts and Quality
• Financial Due Diligence
Wind Resource Assessment and IEC Site Assessment;
Construction Progress Monitoring Service;
GÜRİŞ İNŞAAT VE MÜHENDİSLİK A.Ş.
Owner’s Engineering Services in Project Development and Evaluation Services for 151,2 MW Volovets Wind Energy Power Project
Country: Ukraine
Capacity: 151,2 MW
Brief description:
• Evaluation of the AEP results provided to the CLIENT by 4 different WTG models.
• Proposal of the number of met masts and their height, number of sensors to install and assembly scheme on the masts
• Supervision of met mast instrumentation
• Operation of wind measurement campaigns
• Individual calculation of AEP results including uncertainty and losses for 5 WTG models and 1 hub-height.
• Evaluation of technical documentation provided by WTG suppliers for each offered mode
• Layout optimisation based on the proposed WTG model.
Design Review:
• Review of preliminary (PS) electrical design
• Review of electrical implementation (WD) design
• Review of electrical as-built design
SANKO ENERJİ
Owner’s Engineering Services in Project Development and Evaluation Services for 73.6MW
Güney-1 Wind Energy Power Project
Country: Türkiye
Capacity: 73.6 MW
Brief description:
• Evaluation of the current project portfolio
• Proposal of the number of met masts and their height, number of sensors to install and assembly scheme on the masts
• Supervision of met mast instrumentation
• Operation of wind measurement campaigns
• Weekly review meetings for project evolution and status follow-up, planned in advance, for one-year period.
• Evaluation of any new wind farm project in the scope of technical due diligence
• Participation in meetings with third parties such as wind turbine manufacturers and or other related service providers